Improvements
| There are some ways the project could have been improved. One would be the fact that the generator was started in August but for optimal generation it needs to be warmer therefore if it was started in June or July there would have been better results. Also the generator was stopped after four weeks of production. The problem with this was that it was not finished producing all the gas to its potential. It could have produced more if allowed more time. In the calculations it was assumed that the 8kg of manure were fully used and could produce more but in fact the production was not complete. This only means that the calculations were slightly below what the generator can actually do. |